Water heater install
New tank water heater with updated connections and seismic straps.
Power-vent gas tank set on a raised stand.
New tank water heater with updated connections and seismic straps.
Power-vent gas tank set on a raised stand.
Exterior pressure regulator and main shutoff, plumbed and ready.
New hose bib fitted above the regulator.
New drain piping run below the floor during construction.
ABS drain laid in a trench cut through the slab.
Send us a request online in a couple of minutes, or give us a call.